El Pilar
(Mercator)
276 Mt @ 0.311% Cu Oxide
Cananea Mine
(Grupo Mexico)
7,140 Mt @ 0.42% Cu, 0.008% Mo, 0.012g/t Au, 0.5g/t Ag
Caridad Mine
(Grupo Mexico)
1,800 Mt @ 0.452% Cu, 0.024% Mo
Cumobabi Mine
(Grupo Mexico)
67 Mt @ 0.266% Cu, 0.099% Mo
Piedras Verde
(FRONTERRA)
194 Mt @ 0.36% Cu Oxide
Cumobabi
OPTIONED
Cumobabi consists of 407km2 of contiguous mineral tenure located 130km north east of Hermosillo, the capital of Sonora State, Mexico, and only 60km south west of the smelter at Nacozari. Access to the project is by highway and secondary roads. The property is held 100% by Evrim Resources Corp. subject to a 2% NSR.
Suaqui Verde
OPTIONED
Suaqui Verde consists of 55 km2 of contiguous mineral tenure located 130km south east of Hermosillo, and is currently under option to Inmet Mining Corp. Inmet can earn a 60% interest in the project by paying $250,000 in cash and conducting $5 million in exploration over five years. Evrim is operator on the project.
Cardeleña
OPTIONED
The Cardeleņa project consists of 29km2 of contiguous mineral tenure 130 km south east of Hermosillo, and is currently under option to Inmet Mining Corporation. Inmet may acquire a 60% interest by conducting C$4,000,000 in exploration and making cash payments totaling C$80,000 over a six-year period.
Arroyo Amarillo
OPTIONED
Arroyo Amarillo consists of 209 km2 of contiguous mineral tenure located 180km southeast of Hermosillo and is one of seven projects held by Evrim Resources Corp. within the Sonora porphyry Cu-Mo belt, host to the world class Cananea and La Caridad porphyry deposits.
San Nicolas
Available for Option
San Nicolas consists of 26km2 of contiguous mineral tenure located 180km southeast of Hermosillo, the capital of Sonora State, Mexico and is one of seven projects held by Evrim within the Sonora porphyry Cu-Mo belt, host to the world class Cananea and La Caridad porphyry deposits.
La Noria
Available for Option
La Noria consists of 79km2 of contiguous mineral tenure, 60km north east of Mazatlan, in Sinaloa State, Mexico. Access to the project is by highway and secondary roads. There is excellent infrastructure in the area. The property is held 100% by Evrim Resources Corp. and subject to a 2% NSR.